About Project
Due to the urgent need in the Kahnuj region and to prevent power outages during the summer of (2007), the Kahnuj 50-megawatt power plant was constructed in 9 months. The first unit of this power plant was connected to the grid in (May/June 2007), and the second unit was connected in (August/September 2007).
Project Name: Kahnuj Power Plant
City: Kahnuj
The purchased equipment includes a superheated steam boiler with its equipments .